HOUSE X TWO


south face of rear two story addition with master bedroom dormer

With concrete foundations done, the framing has has been completed.  The new two-story addition exterior shell and interior walls are now finished.  The new area from the addition has increased the size of the original house x two.  The master bedroom will have a  15 foot high volume ceiling with two skylights and large areas of windows. 

master bedroom space

master bedroom ceiling....15' high

east end of rear addition

With the recent mid-January break in the cold weather, we were able to get the concrete side walks set up and  poured.  A grade level concrete patio with a fire pit was incorporated into the rear yard area. Along with a new wood deck, these two elements will contribute to a great outdoor space suitable for relaxing or entertaining.  The remaining space between the deck and the garage will become a landscaped yard with a wood privacy fence. 


concrete side walk leading to front entry porch and rear yard


rear patio and fire pit


With the framing complete, the interior plumbing piping will continue this week.  Mechanical and electrical work will start next week.   Inspections, insulation and drywall to follow. 