4727 NORTH LOWELL TRANSFORMATION BEGINS.......

front elevation

Our next renovation project is under construction at 4727 North Lowell.  Located on the northwest side in the Mayfair Neighborhood, this area is east of our last several projects which were in the Portage Park neighborhood.  The small, brick Georgian style house will get a full renovation with a generous rear, two story addition.   Located on the southeast corner of Lowell and Leland Avenues, this house will get huge amounts of sunlight from three exposures. 


overgrown rear yard

The rear yard was overgrown and heavily wooded with numerous trees and shrubs, it was like a mini forest. The site was cleared with the trees and vegetation removed.  A clean site was prepared in order to do the excavation for the new addition and rear garage. 


rear yard after tree and shrub removal


area of new addition

Demolition was completed down to the exterior brick shell and floor systems.  We retained the original wood front door and interior stair and handrail but little else remains from the house. 


demolition is complete

former Dining Room will become the new 1st Floor Office
Some of the existing masonry walls, made from Chicago common brick will be cleaned and left exposed. This creates a rustic warmth and adds a unique modern feel.  



excavation for new addition

poured concrete foundation wall for new addition

Excavation was completed for the new foundation walls.  The new addition will have a crawl space with limited access.  During our small window of warmer weather last week, we were able to complete the concrete foundation walls and garage slab.  The concrete is curing and getting more compressive strength with every day that passes.   The wall will be back-filled with dirt and compacted.   Framing for the new addition will start in the first part of January.


rear facade of original house with new openings

new basement and 2nd floor bedroom window openings

The masonry work has also been completed.  Some former windows were filled in and many new windows openings were added in the basement and the second floor for additional light.    

new masonry opening to connect old with new


A new five foot wide masonry pass-thru from the old house to the new addition.  An exposed steel beam was used as the lintel to support the brick at this transition. 



Work on the renovation / addition will continue throughout the winter months.  We are aiming at a mid April completion date for 4727 North Lowell.  